NewGridAI completes acquisition of Pronghorn Resources NASDAQ: GRDX

PRONGHORN POWER CAMPUS • POWDER RIVER BASIN, WYOMING

Powered Land for Hyperscale AI

POWER CAPACITY TODAY 600 MW
INFRASTRUCTURE PLATFORM
3,200 Wells 450 Miles of Pipeline
TARGET CAMPUS SCALE 5 GW+
CAPEX SPENT ON PROPERTY $3.2B
BALANCE SHEET Debt Free

Core Partners

  • Kodiak Power Solutions
  • Western Midstream
  • Kinder Morgan
  • Wood
  • FANCO, First American Nuclear
  • Mercuria
Pronghorn Power Campus

Power, Land and Water for the AI Buildout

Pronghorn Power Campus is an operating energy asset in the Powder River Basin with producing gas, abundant water, existing infrastructure, and a clear pathway to behind-the-meter power for hyperscale AI data centers — all under one platform.

100 MMcf/d Natural gas produced today
600 MW At wellhead today
14.5M gal/d Water produced today
The GridAI Model

Own The Fuel. Make The Power. Feed The AI.

GridAI turns its producing Wyoming gas into firm power today, aiming to add EAGL-1 nuclear baseload next, and sell 24/7 behind-the-meter power to hyperscale AI data centers — with assets already owned today.

1
Own The Fuel

OWN THE FUEL

3,200 producing gas wells and 450 miles of owned pipeline — fuel at cost, with gas already flowing.

2
Gas to Power

GAS TO POWER

Imminent ability to generate on-site power with ability to grow rapidly.

3
Power AI

POWER AI

Hyperscale AI campuses plug in behind the meter — firm 24/7 power, no grid queue.

4
Nuclear Option

NUCLEAR OPTION

Substantial upside through EAGL-1 nuclear baseload: a 1.4 GW cluster of six units.

All-in-One Owned Platform — Land • Gas • Pipeline • Water • Tier-1 Dark Fiber • Nuclear Potential

One company owns the entire stack — molecules → megawatts → AI compute, all behind one meter.

Learn About the Platform
The Current Market

The Opportunity: Power is the Constraint

US data centre load is projected to nearly double to 150 GW by 2028. Hyperscalers have committed $690B+ in CAPEX, with approximately 75% directed to AI infrastructure.

Explore the Opportunity
The Platform

One Company. The Entire Stack.

From molecules to megawatts to AI compute — GridAI owns the fuel, the infrastructure, and the pathway to firm behind-the-meter power for hyperscale campuses.

Learn About the Platform
About GridAI

The Power Infrastructure Platform for Hyperscale AI

GridAI is building a vertically integrated energy platform designed to deliver firm, behind-the-meter power to hyperscale AI data centers. Centered on Project Pronghorn in Wyoming, the company controls producing gas assets, large-scale land, water, pipeline infrastructure, and a clear pathway to nuclear baseload.

The Company

GridAI (NASDAQ: GRDX) is the public company developing and owning the Pronghorn platform. The company combines producing energy assets with a clear multi-phase power strategy designed to serve hyperscale AI demand.

The Project

Pronghorn Power Campus is the core asset — an operating energy campus in Campbell County, Wyoming with producing gas, water, land, and infrastructure already in place, positioned for behind-the-meter power delivery to data centers.

The Platform

The GridAI model turns owned fuel into firm power today, with a pathway to nuclear baseload, creating a fully integrated stack: land, gas, pipeline, water, fiber, and power — all behind one meter.

Hyperscale data hall powered by GridAI infrastructure
Technician servicing compute hardware at the Pronghorn campus
Integrated power and data cabling inside a GridAI rack

Investor Resources

Investors

Investor Information

Access filings, financial reports, governance documents, and complete disclosure materials for NASDAQ: GRDX.

Investor Center
Contact

Get in Touch

Investor inquiries, partnership discussions and media requests about GridAI and the Pronghorn Power Campus.

Contact Us

Stay Updated